Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2020
HCA
Healthcare
Interiors, New Construction
52,000 sq. ft., 3-Stories
ACI Boland, Hereford Dooley Architects
Risk Management
Virtual Design & Construction
Self-Perform Operations
The state-of-the-art, 56,500 sq.ft., three-story medical office building on the campus of the HCA Lee’s Summit Medical Center in Lee’s Summit, Missouri provides the bariatrics program a larger, updated space with more capabilities to treat patients. Bariatric treatment can greatly reduce the risk of developing chronic conditions such as sleep apnea, type 2 diabetes, high blood pressure, heart disease and stroke. The project also included a 1,900 sq. ft., grade-level connector between the MOB and the existing MOB adjacent to the site. Work included Earthwork, Utilities, Drilled Piers, Concrete, Asphalt, Masonry, Steel, Gypsum Assemblies, minor interior finishes of the core, MEP, and elevators.