Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor44852
Greenwich Country Day School
Education
New Construction, Restoration
52,000 sq. ft., 2-Stories
Architectural Resources Cambridge Inc.
Risk Management
Supply Chain Management
The GA Middle School follows the success of GCDS' Upper School and Performing Arts Center projects. The school combines the campus' original 1890's mansion with a modern addition that creates a dynamic and flexible learning environment. The school includes 19 general classrooms, three specialty classrooms, wood shop, art studio, and a developmental learning classroom arranged along two north-south wings.
The project features many sustainable features such as the first ICF (insulated concrete form) exterior wall /structure for a school in Connecticut as well as Electrochromatic [Automatic Darkening] Glass, and an extensive Photovoltaic solar system on the roof. Building on GCDS’ commitment to sustainability, our team achieved energy efficiency by combining a series of high-performance materials, methods, and systems with power production. The building boasts following features: