Become a Subcontractor2019
The Cleveland Clinic Foundation
Healthcare
Interiors, New Construction
205,750 sq. ft., 6-Stories
SOM
Risk Management
Supply Chain Management
Offsite Construction
The Cleveland Clinic Weston Expansion Phase 2 project consists of 6-story, 205,750 sq. ft. expansion that contains a new emergency department on the ground floor, two floors for an Intensive Care Unit, one floor for Acute Care, one shelled space on the top floor, a central utility plant serving the new building via a utility/pedestrian connector bridge, 539 spaces surface parking lot, and 105,891 sq. ft. of interior renovations in the main hospital. The project is designed and built to LEED Silver standards but not certified.
A new Central Utility Plant with (2) 2,000KW generators and (5) 800 Ton cooling towers that serve the new building via underground piping and up thru the new connecting corridor that runs in front of the main campus building.
In additon, there was 105,891 sq. ft. of interior renovations throughout the main hospital building including the lobby and waiting area, ORs, Imaging rooms, pharmacy, labs, and food service.