Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2011
Sysco Philadelphia, LLC
Industrial/Manufacturing
Interiors, New Construction
266,000 sq. ft., 1-Stories
LEO A DALY
Turner provided multi-phased design/build services for the design and construction of a prototype refrigerated warehouse. This project consists of a freezer, cooler, and cold dock addition (33 docks) to the existing facility on Packer Avenue. Phase 1 also consisted of demolition of the existing fuel island and construction of a new maintenance building/fuel island, paving, and site improvements. The foundations are timber piles with pile caps, grade beams, pile-supported structural slab, steel structure, insulated metal panels and precast for the exterior wall, TPO roof membrane, and an ammonia refrigeration system for the freezer and cooler. Phase 2 consisted of renovation of the existing warehouse into an expanded dry warehouse facility including new operations offices, break room, bathrooms and lockers, hydrogen-fueled equipment storage, lighting, and an Esq. ft.R fire protection system. The new expansion totaled 238,000 sq. ft. and the renovations totals 28,000 sq. ft. The project also involved the installation of 4,000 sq, ft, of photovoltaic panels on the roof.