Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2011
SFO Airport Commission
Aviation/Transportation
Site Work, Infrastructure, Interiors, New Construction
640,000 sq. ft., 1-Stories
Gensler
Turner provided design-build services for the renovation and expansion of Terminal 2 Boarding Area D at the San Francisco International Airport. The project includes the conversion of the former international terminal into a 640,000 sq. ft., 14-gate domestic terminal for American Airlines and Virgin America. The scope also includes passenger loading bridges with aircraft support systems, baggage handling systems, mezzanine level access to the APM system, and mechanical and electrical upgrades. The project is the first LEED Gold certified airport terminal in the United States.
The terminal has been reconstructed as a high performance green building utilizing sustainable measures such as energy saving daylighting strategies and an energy efficient displacement ventilation system. Turner’s experience with USGBC’s construction phase documentation requirements assisted in preparation of the documentation. Designed to improve indoor air quality and reduce energy consumption, the innovative sustainable elements included in Terminal 2 will reduce greenhouse gas emissions from the facility by an estimated 1667 tons per year. Turner tracked all construction credit documentation waste and recycling program and air quality data.