Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2020
Nationwide Children's Hospital
Healthcare
New Construction
57,520 sq. ft., 3-Stories
Risk Management
Supply Chain Management
Virtual Design & Construction
Construction of the new three-level, 57,520 sq. ft. West Energy Plant is designed to support the Behavioral Health Pavilion and future campus development. The energy plant occupies house boilers, chillers, generators, and a normal power and water feed.
An underground tunnel system, directly connected to the Behavior Health Pavilion, provides pedestrian circulation between the two buildings and makes available connection locations for future buildings. To protect the client’s capital investment and help control construction costs, Turner Logistics was directly engaged with the project team to facilitate the procurement and delivery of the plant’s mechanical equipment.