Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2017
The Greater Vancouver Water District
Government/Public
Kasian
Interiors
263,000 sq. ft., 16-Stories
The Metro Vancouver HQ project was a large scale fit-out of 16 vacant floors, 263,000 sq. ft. at Metro Tower III in Burnaby. The project scope included several floors of office space and two specialty levels housing, a boardroom with auditorium seating and fully integrated audiovisual system, as well as an interconnecting staircase and commercial-grade cafeteria.
Turner provided preconstruction services leading into an 11-month construction schedule, and managed 39 trades with over 130 trades people on site at the peak of construction. A strategic organizational structure split the field team into 2 teams that aligned with the building design. The “low-rise” team managed levels 10-17, which were generally workspace floors and the “high-rise” team managed levels 21-29 which had higher-end finishes and included the stair and kitchen. This provided the project with focused supervision.