Headquarters
Turner Construction Company
66 Hudson Boulevard East
New York, NY 10001
(212) 229-6000 turner@tcco.comEthics & Compliance Hotline
Report issues 24 hours a day, 7 days a week to Turner’s Confidential Reporting System
(888) 738-1924 https://turnerconstruction.ethicspoint.comSubcontractors
Before reaching out, please review our prequalification requirements.
Become a Subcontractor2022
Barclays Capital, Inc.
Commercial
Interiors
250,000 sq. ft., 5-Stories
Gensler
Risk Management
Supply Chain Management
Virtual Design & Construction
Self-Perform Operations
Located at 125 S. West Street in downtown Wilmington, DE, the Barclays Dryrock Fit-out was a two-phase renovation project, with the first phase consisting of the first and second floors, totaling 35,450 sq. ft. The second phase consisted renovating the third through fifth floors, totaling 128,332 sq. ft. The finished space is home to Barclays existing banking operations, with the intention behind the renovations to encourage greater colleague engagement, improve working conditions, and enhance the existing technology systems. The fit-out work included selective demolition for new programming and amenities, upgraded finishes, and a new client space. The upgrades consisted of a new reception desk and lobby, and an upgraded café. Given the bespoke quality of the new finishes and systems, coordination with Barclays end-users was critical. BIM was utilized in design for all above-ceiling MEP systems, furniture, workspace connections, and café equipment. With the specialized nature of the common spaces and amenities, enhanced coordination processes and meetings were implemented to ensure proper fit and compatibility was achieved with all end-user equipment.