The replacement of the chillers and construction of a stand-alone chiller plant at Fort Detrick included installation of a variable primary chilled water distribution system that provides 3,300 tons of cooling capacity with N+1 redundancy. The chilled water system ties into piping of the adjacent building. Due to the nature of the facility and its research activities, all outages and tie-ins were closely coordinated with the facility manager to minimize interruptions to the facility’s operations. After the system had been thoroughly tested and approved, the Turner team was responsible for the decommissioning and demolition of the original plant.
Redstone Arsenal, AL
James A. Haley Veterans’ Hospital Bed Tower Expansion
Tampa, FL
Centers for Disease Control and Prevention East Parking Deck
Atlanta, GA
For Services / Specializations
and Additional Key Contacts
See Office Network
*Office includes a Special
Projects Division or Interiors
Group