The Safeway Distribution Center sits on a 116-acre site with 13 power man vaults and 11 communication vaults 10 foot x 10 foot x 6 foot. Between these vaults is electrical duct bank encased in concrete. The site has a self-contained storm system with six oil water separators that discharge into a two cell holding pond that is approximately four-acres with the capacity of 8.6 million gallons. The site has four asphalt parking areas for employee parking. Around the nine structures is a concrete section of paving consisting of six inches of crushed rock with nine inches of concrete paving for the heavy truck traffic areas.
Sacramento Municipal Utility District, East Campus Operations Center
Sacramento, CA
Livermore, CA
Kansas City, KS
For Services / Specializations
and Additional Key Contacts
See Office Network
*Office includes a Special
Projects Division or Interiors
Group