Manassas Premium Data Center

Previous Next

project at a glance

The Manassas Premium Data Center  was constructed in seven phases, the shell structure was renovated to accommodate raised flooring and the electrical infrastructure is designed as isolated redundant with 2N distribution from UPS to equipment via PDUs located on the raised floor.  The incoming service is 12.47kV with closed transition transfer scheme with redundant utility and paralleling switchgear. The mechanical systems are designed with N+1 redundancy with pre-packaged chiller plant system located outside the facility.