Massport Central Garage Repairs & Expansion

Previous Next

project at a glance

The Repair and expansion of the Central Parking Garage at Logan International Airport includes a 2,600,000 square foot, 8,000-vehicle, eight-level structure, with four seven-story stair / elevator towers. Renovation work included replacement of cast-in-place girders and precast double tees on the first three levels. The expansion included precast concrete structure on levels five, six, and seven built over the existing garage on columns passing down through the existing garage and a precast, moment frame façade.  The project also included four eight-level stair and elevator towers clad in precast, curtainwall, and metal panels. The garage remained open to the public during construction activities. 