Cam Ranh International Passenger Terminal

Previous Next

project at a glance

The International Terminal (T2) was officially put into operation on June 2018 after 19 months of construction. The T2 project came  about a time to inject much needed capacity into the airport operating infrastructure. At the same time, facilities and services were upgraded to match international standards.

T2 covers a total area of 50,500 square meters (544,000 square feet), made up of dedicated levels for departure and arrival processing. The terminal building has a unique architecture inspired by the shape of a swallow's nest, native to the Khanh Hoa province, and the waves Nha Trang Bay - a signature representation of the South-Central Coast.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group