Manufacturing Client, Laboratory and Maintenance Building

Previous Next

project at a glance

The two-building, Laboratory and Maintenance facility for this chemical manufacturing client was completed in multiple phases.

The first building is a 33,000 square foot chemical laboratory building that contains water, chemist, additives, fire, mixture induction, film, and hygiene labs. In addition to laboratory space the building contains office support, conference space, and specialized storage.

The second building is a 50,000 square foot maintenance building that contains an electrical instrumentation shop, a mechanical shop, and a kitting area for plant shutdown/turnarounds, and offices, break rooms, showers, and locker rooms. The facility houses the company's maintenance, repair and operations shop as well as their engineering and installation shop, along with associated administrative facilities.

Work included installation of numerous monorails, secondary containment for paint shops, and a 25-ton bridge crane.
 

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group