The four-story, 140,000 square foot bed tower addition at Provena Saint Joseph includes 99 private patient rooms along with a new heart center, administration spaces, nursing areas, servery and dining facilities.  This addition provides access to the original structure at all floors.  A focal point of the addition is the Hybrid Cath Lab, a space which brings together the equipment and technology to do both lab procedures, like the implantation of a pacemaker, and perform open-heart surgeries, like a coronary bypass.

A three level expansion on the east side of the existing facility included upgrades to the generator power, boilers, and medical gas equipment for the entire operating facility,  three new Cath. Labs, four new operating rooms, 14 Stage II Recovery beds, and a women’s diagnostic radiology center.

Multi-phase interior renovation on the second floor included one Cysto/OR update, 21 Stage I Recovery beds, expansion of sterile and sub-sterile facilities, as well as renovation and expansion to the Surgery Department Waiting Area.

During the development of construction documents, Turner Logistics managed the relocation of existing equipment and the purchasing of additional equipment for Provena Saint Joseph Hospital. They were also able to manage the supply chain for custom air handling units, chillers generators, cooling towers, boilers, variable frequency drives (VFDs) and a switchgear.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group